Columbus School

Columbus School

Customer: Skanska Location: Chelmsford

Bailey Streetscene were asked to supply and install a covered walkway along the main entrance to the building that incorporated wall fixing arrangement and integral gutter system.

The Canopy was designed to compensate for a fall to floor level whilst maintaining weather protection.

The structure was manufactured in galvanised and powder coated steel sections with integral gutter system to provide a streamlined and efficient system.

Roles & Responsibilities:

  • Initial design consultation
  • Outlining costing proposals
  • Project management
  • Manufacture, supply, installation, site liaison
  • O&M and RAMs documents produced
  • Additional works
  • Design / adaptation of existing product to comply with the project requirements
Columbus School